
looks like this piece will be done by the end of next week --- which means I'll be thinking about matting and framing then
the binding has been attached to the zebra piece, needs the hanging loops to be stitched in as I finish the back edge of the binding then I'll be heading off to somewhere for a .25 inch dowel rod for the hanging rod ---
guess it's time to spend some time working on the beaded beads for the zebra and the giraffe pieces ---- and to cut the stamp for the elephant
the final leaf block has all been kitted up, so I may be working on that today -- we'll see
I'm going to have a houseful of people today --- my daughter and her husband are bringing the quilt I made for him so I can enter it in the State Fair (those entries go to the Fair next Friday), and my sister is bringing me a box of peaches --- this is a test for me --- usually I would be flying around the house cleaning, vaccuuming, mopping --- none of which am I allowed to do yet --- I did give the bathroom a "lick and a promise" cleaning and put down a clean bathmat --- that's it folks!
No comments:
Post a Comment